Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | ncn62, tpt, transpenninetrail |
Date time: | 3.10pm, Tuesday 30th August, 2016 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | peteowens |
Copyright: | Public domain |
Download: | View full-size original |
Area: | Birchwood |
Cycle bridge. I'm not sure how the expense was justified being as how Barnard Street crosses a perfectly acceptable bridge imediately to the north.
Comments reflect the views of the original submitter only.