Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | ncn62, tpt, transpenninetrail |
Date time: | 12.27pm, Tuesday 6th September, 2016 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | peteowens |
Copyright: | Public domain |
Download: | View full-size original |
Area: | Birchwood |
A 500m long stretch of the Trans Pennine Trail with a decent tarmac surface - could do with cleaning as mud tends to accumulate in the cutting.
Comments reflect the views of the original submitter only.